Your Trusted Control Valve Manufacturer & Supplier
Outdoor pipeline valve

Control Valve Solutions for Industrial Buyers

Tailored control valve support for EPC contractors, OEMs, distributors, process plants and MRO teams—from RFQ review and valve selection to documentation, replacement and supply support.

Control Valve Supply for EPC & Engineering Projects

Get a technical offer your engineers can evaluate and your procurement team can compare.

MacoTango supports control valve selection and supply for EPC contractors, engineering companies and system integrators. Send your valve list or datasheets to review the proposed configuration, technical exceptions, documentation and delivery requirements.

Chemical process plant towers

Match the Control Valve to the Process Duty

A control valve proposal should explain how the selected assembly fits the operating conditions—not simply repeat the line size and pressure class.

Aerial view of a power plant
Capacity and Operating Range

Review the available minimum, normal and maximum flow cases with their corresponding inlet pressures, outlet pressures and temperatures. Establish the sizing basis, proposed rated capacity and expected operating range before confirming the valve and trim.

For gas service, identify the flow reference conditions and pressure basis so the calculation is not built on incompatible inputs.

Materials and Service Conditions

Assess the body, trim, seat and packing against the specified medium, design conditions and operating environment. Duties involving cavitation, flashing, noise, corrosion or erosion require additional review before a configuration is confirmed.

Any limitation affecting the proposed construction should remain visible in the technical offer.

Actuation and Installation

Review actuator sizing against the required shut-off differential pressure and available utilities. Confirm the specified failure action, control signal, positioner and accessories, together with end connections and installation constraints.

The required safe position must be defined by the project team rather than assumed from the valve’s normal operating position.

Give Your Review Team a Clear Basis for Evaluation

Organize the proposal around your valve tags and project requirements, so engineering and procurement can review the same scope.

Tag-based configuration

The proposed valve, trim, materials, actuator, positioner and included accessories for each item.

Selection basis

The process inputs, sizing basis and important limitations used to develop the proposal.

Compliance and exceptions

Requirements supported by the offer, proposed alternatives and information still needed.

Commercial scope

Included items, optional items and exclusions associated with the proposed configuration.

Keep Compliance, Alternatives and Open Points Separate

A proposed alternative is not presented as approved compliance. Missing information remains identified until it is confirmed, and any requirement outside the offered scope is stated explicitly.

Respond to Comments by Tag and Revision

Engineering comments should reference the affected valve tag and document revision. Revised proposals identify changes to the configuration and any resulting effect on price, documentation or delivery.

Your team should be able to see what is being offered, what differs from the RFQ and what decision is needed next.

Pneumatic shutoff valve datasheet

Selected EPC & Engineering Project References

Selected project references involving EPC contractors, engineering companies and system integrators across coal chemical, petrochemical, ammonia, urea, power and industrial process projects.

ProjectValve ScopeQTYEPC / Engineering / Integrator
Longmei Tiantai Coal-to-Aromatics Project Globe Control Valves 162 Sedin Engineering
2 Billion m³/a Coal-to-Synthetic Natural Gas Project Control Valves 126 Sedin Engineering
Zhongmei Tuke Ammonia & Urea Units Pneumatic Control Valves, High-Pressure Valves, Pneumatic Shut-Off Valves 98 Sedin Engineering
PetroChina Sichuan Refining & Petrochemical Integrated Project Main Bypass Control Valves, Small Bypass Control Valves, Desuperheating Water Control Valves, Globe Valves 12 China Chengda Engineering
Inner Mongolia Guangju 5 Mt/a Coking Polygeneration Project Control Valves, Shut-Off Valves 69 SUPCON Technology
Jinhang Furnace Pilot Unit Pneumatic Control Valves, Shut-Off Angle Valves, Shut-Off Ball Valves, Butterfly Valves 59 Xi'an Aerospace Propulsion Engineering
JISCO No. 5 & 6 Stamp-Charged Coke Oven Dry Quenching Project Minimum Flow Valves, Control Butterfly Valves, Control Valves 42 Jinan Iron & Steel International Engineering Technology
Xineng Energy 200,000 t/a Stable Light Hydrocarbon Project & 2 × 260 T/H Boiler FGD / DeNOx EPC Package Pneumatic Shut-Off Valves, Ball Valves, Butterfly Valves, Gate Valves 641 Beijing Zhongda Energy & Environmental Engineering

* Selected EPC and engineering project references. Additional project records and supporting documentation are available upon request.

Need evidence relevant to your project? Tell us the application, valve scope and qualification requirements so we can identify the available supporting records for review.

Agree the Documentation and Inspection Scope Before Order Placement

Identify the documents your team needs for tender evaluation, engineering approval, inspection and final handover. Submission stages, required formats and any additional costs should be agreed with the supply scope. For each item, agree the reviewer and submission milestone. Label its actual status: proposed, for review, approved only after approval, or as-tested only after execution.

Control valve datasheet form

Technical datasheets and sizing information

Required fields, calculation basis, review format and document revision.

GA and interface drawings

Connections, dimensions, installation arrangement and required submission stage.

Material documentation

Required certificate type, component coverage and traceability expectations.

Inspection and test records

Test procedures, acceptance criteria, witness or hold points and reporting requirements.

Actuator and accessory documentation

Data and certification applicable to the actual supplied models.

Identification and handover documents

Valve tags, packing information, manuals and the agreed final document package.

Review the Specified Standards—not Just a General Compliance Statement

Provide the required standards and editions with the RFQ. The offer should identify the applicable manufacturing and testing basis, together with any different standard, proposed substitution or limitation requiring review.

Confirm Inspection Requirements Before Execution

Share your inspection and test plan, required witnessing arrangements and third-party involvement before the scope is finalized. Availability, scheduling and additional charges must be confirmed for the specific order.

Final records should describe the equipment supplied and the work actually performed.

Define the Assembly Factory Acceptance Test (FAT) Scope

Use this matrix to discuss the functional checks needed for the proposed valve, actuator and accessories. The selected checks, procedure, conditions and acceptance limits must be confirmed for the project. This is a proposed scope, not a completed FAT record.

Project-selected functional checks
Review itemAgree before testingRecord after testing
Travel, command and feedbackAgree command points, travel range and available feedback type.Record command, measured travel and available feedback separately. Discrete limit states are not continuous position feedback.
Included accessoriesAgree the applicable functions of supplied positioners, solenoid valves, filter regulators, limit switches and lock-up devices against the approved diagrams.Identify each supplied accessory and record its observed function or state.
Loss of airDefine the loss event, starting position and expected action for the approved air circuit.Identify the air supply removed, supplies/signals remaining, and observed travel or held position.
Loss of electrical powerDefine which supply is lost, starting position and expected action.Record supplies/signals remaining and actual valve/accessory states.
Loss of command signalDefine the interrupted signal and expected action; account for shared supplies or loop-powered devices.Record what was removed, what remained available and the actual response.
Response, where specifiedAgree timing definition, starting position, travel range, supply, load/differential-pressure conditions and limits.Keep time-aligned command/travel records and actual test conditions.

Mark non-applicable checks N/A with a reason; keep unperformed checks and deviations visible. An as-tested record identifies the assembly, procedure revision, actual conditions, acceptance limits and results.

Functional results apply to the tested assembly and recorded conditions; they do not by themselves establish pressure or seat-leakage acceptance, installed-system protection, or completion of site commissioning.

Commercial & Delivery Basis

Know What You Are Buying—and When You Can Receive It

Share the quotation deadline and required delivery location early so both can be considered in the offer.

A Defined Price

The quotation identifies the complete assembly, included accessories, documentation, inspection and packing scope. Optional items and exclusions are shown separately so your team can compare offers on the same basis.

Supply Scope Exclusions

A Clear Delivery Basis

The schedule distinguishes manufacturing lead time, dispatch and required arrival. Payment, technical approval and inspection dependencies are stated before order confirmation.

Lead Time Required Arrival

An Agreed Inspection and Release Scope

Confirm the required tests, acceptance criteria, witness arrangements and records before manufacturing. Any proposed change to the accepted configuration is submitted for review rather than substituted without approval.

Inspection Release
EPC Project RFQ

Send Your Valve List or Project RFQ

Share the valve list, datasheets, project specifications, ITP or approval requirements you already have. We will review the proposed supply scope, technical open points, documentation requirements and quotation basis before the offer is finalized.

Start with the project documents you already have. Incomplete RFQs are acceptable; unresolved technical data can remain marked as TBD. Need a starting template? Use the Excel valve datasheet and datasheet completion guide.

No file selected

    EPC Procurement FAQs

    Questions Before Evaluating a Control Valve Package

    Yes. Send the available revision and tell us whether you need a budget estimate, tender proposal or firm quotation. We can identify the relevant supply scope, missing information and conflicting requirements first. Any selection that depends on unconfirmed process data remains preliminary until those inputs are resolved.

    Yes. Send the required format with the RFQ. The response is prepared against the actual proposed configuration and available supporting information. Confirmed compliance, deviations and unresolved points remain distinguishable rather than being presented as unconditional compliance.

    Where the project permits alternative manufacturers or new-vendor evaluation, we can prepare the proposed technical basis and relevant supporting information for review. MacoTango is identified as the proposed manufacturer, and any relevant differences remain visible. Final acceptance remains with the authorized EPC or end-user reviewer.

    Project GA drawings are normally prepared after the technical configuration and commercial basis have been confirmed. If your tender requires drawings before order placement, include the required drawing content and submission date in the RFQ so the pre-order deliverables can be agreed separately.

    Send the inspection and documentation requirements with the RFQ. We review the requested tests, acceptance criteria, hold or witness points, material records, certificate requirements and third-party inspection scope before confirming what is included. Additional verification may affect price and execution schedule.

    Provide the required arrival date, delivery location and available technical documents. We review feasibility against technical confirmation, material availability, manufacturing, inspection and transport requirements. The quotation states the applicable delivery basis and the conditions that affect the schedule.

    Yes. Send the comments with the relevant valve tag and document revision. We review each affected requirement and identify whether the change affects the valve configuration, commercial scope, documentation or delivery. Revised items remain distinguishable from requirements that have not changed.